Back   Main >> home

Activity Report 2009

Laborelec News June: Natural Gas Technologies

Our organisation

R&D recognized for value creation

Laborelec participates in FP7 Anastasia project

energy logoenergy check-upenergy specialistexpertise in environment

Equipment Assessment

> Materials technology
> Vibration analysis
> Process control & 
   automation

Rational Use of Energy

> Energy Scans
> Lighting
> Water treatment & 
   monitoring
> Combustion optimization

Quality of Supply

> Power quality
> Electromagnetic 
   disturbances

> Electrical networks
> Electrical metrology

Care for the Environment

> Renewables & biomass
> Flue gas analysis
> Oil analysis

A challenging weld repair of Grade 91 tubing by avoiding PWHT 

In a collaborative research program, the BWI and Laborelec undertook the challenge to investigate the feasibility of a Cold Weld Repair methodology in order to weld repair T91 tubes without the use of gas backing and PWHT. The feasibility study so far demonstrated that a repair method based on the selection of an undermatched consumable and a controlled deposition procedure can result in an acceptable microstructure and hence inherent
properties. The results of the research program are very promising for temporary repair welding of T91 tubes within the containment of the boiler.

Read more