Warning: mysql_num_rows(): supplied argument is not a valid MySQL result resource in /var/www/laborelec.be/laborelec.be/wwwroot/index.php on line 56 laborelec.com :: Main-references
Residual life of superheater assessed Manu Struyven Installation manager at Electrabel Best planning maintenance and replacements Marc Anciaux Plant Engineering Manager, Caterpillar
Care for the Environment
Re-using process water offsets the rising costs of water Rudi Lambrechts Project engineer for Janssen Pharmaceutica Thanks to Laborelec we now produce ‘green’ steam at a fossil fuel fired power plant Frank Van den Spiegel Project leader at Electrabel
Rational Use of Energy
Savings on utilities lead to increased production Johan Saerens Technical Services Manager at Genencor New production line designed with energy savings in mind Peter Decaigny Departmental head of power plant and central management at Volvo Cars Ghent
Quality of Supply
Training courses provide a better understanding of Power Quality Olivier Colombat Product and Services Development, Energie du Rhône Accurate measurements of electromagnetic fields guarantee the safety of our co-workers Thierry Vandevelde Process and Product Development Manager at Umicore IMEC impressed Vic Meynckens Key Account Manager at Electrabel